Foundations for a flat and uncomplicated terrain. It includes sanitary slab of one block and a layer of gravel under the slab with a thickness of 10 cm.
Supply connections. It includes derivations of the house installations from the ground floor slab up to a maximum distance of 15 linear metres in the direction of the public road.
House structure through a 25 m YTONG BLOCK with interior wall cladding:
a. 48 mm metal auxiliary structure
b. Rockwool 50 mm
c. Laminated gypsum board 15 mm
The upper termination of the house will be materialised through the configuration of a FLAT ROOF WITH TRUSSES
1 – False ceiling: laminated gypsum boards
2 – Vapor barrier (waterproofing)
3 – Mitek truss
4 – Rockwool based insulation
5 – Waterproofing with sandwich panels to improve insulation
SATE EXTERIOR FINISH
Executed using ACRYLIC MORTAR (responsible for the rough finish of the surface).
Installation on slab base depending on the project, with provision for connections and drains.
Ground floor: Caviti insulation with 4 cm extruded polystyrene panels, in order to close thermal bridges, with application of a subsequent compression layer of mortar.
It will be finished with AC4 laminated parquet flooring.
PVC carpentry with thermal bridge break and interior reinforcement.
Till and turn windows, with double glazing. The thickness of the glass follows the sequence (4/16/4 mm).
1.- Windows with manual blinds: width 120-140 cm. - height 118 cm
2.- Picture windows: height 218 cm without blinds
Available colour: white (Other colours available.
Price on request according to dimensions).
Interior doors with monobloc solution made of MDF, semi-matt composition, smooth white colour.
The interior dividing elements are defined by the following configuration:
The interior cladding will be executed by means of gypsum plastering, accompanied by the relevant coat of interior paint.
Bathrooms: laying of ceramic tiles on the floor and wet areas (shower). In the rest,
painting.
The layout of the installation will be executed according to the calculations and design
made in the Executive Project, based on the Low Voltage Regulations and the relevant Technical Instructions.
The lighting will be by means of LEDs. The number of light points will be proportional
to the surface area of the dwelling.
Number of light points and switches included according to the project to comply with CTE standards.
Includes hydraulic and electrical pre-installation, tiles in wet areas, and an allocation of €3,000.00 for furniture without appliances.
A wide catalog of qualities and models is available to the client.
Standard installation for each bathroom planned in the project:
STANDARD BATHROOM –
/ ROCA OR SIMILAR WASHBASIN BRAND
/ MIRROR
/ STORAGE CABINET FOR BATHROOM
/ WASHBASIN FAUCETS
/ TOILET, CISTERN, SEAT
/ SHOWER PLATE
/ SINGLE LEVER SHOWER FAUCETS
/ FIXED SCREEN
A system based on aerothermal energy for domestic hot water supply (DHW) will be installed; 110L monobloc storage tank.
HEAT PUMP – DUCTED COLLING
It includes the pavement around the perimeter of the house.
Fence included:
Street side: wall + car sliding door and entrance door
Other sides: metallic fence